Manager’s Messages

Community Update - 10/20/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Garage Carpet – the carpet at the garage elevator landing will be replaced on Wednesday, October 21st from 8:30am – 5pm. The floor area will be closed to pedestrians during this procedure, scheduled is listed below. We will do our best to accommodate necessary traffic.

Columbia Side carpet replacement from 8:30am – 12:30pm, please use the India Elevators during this time.

India Side carpet replacement from 12:30am – 4:30pm, please use the Columbia Elevators during this time.


Community Update - 10/9/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Columbus Day – Monday, October 12th as a reminder there is no work permitted on the holiday, please notify your contractors.
  2. Board Meeting Reminder – October 13th at 6:00p.m. Via ZOOM.
  3. Garage Metal Gate – the metal gate will be replaced soon. We are estimating this to take place on Wednesday, of October 14th. We will provide the exact hours of gate closure 24 hours prior. Please plan according if you need to leave building with your car that day; or if you have a guest or vendor using your parking space.

Community Update - 9/4/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Labor Day – September 7th, the Management office will be closed. Call 1-800-400-2284 for a maintenance emergency. As a reminder there is no work is permitted on the holiday, please notify your contractors.
  2. Garage Power Washing – will be scheduled soon. Cars will need to be moved for this work. More details to follow.
  3. Board Meeting Reminder – September 8ththat 6:00p.m. Via ZOOM.

Community Update - Gate Closure 8/20/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Garage Additional Lighting – we will be installing some additional lighting around the garage ramp entrance Thursday, August 20th from 8:30am to 10:30am.

There will be times that the driveway can be blocked for intervals of 20 minutes until the work is completed.

Please notify Security if you need to exit while the gate is down and we will pause work and open the gate. We will do our best to work with any emergency situation.

GARAGE GATE INTERMITTENT CLOSURE

August 20th from 8:30am to 10:30am.

We kindly request that you utilize an alternate entrance to the building if you are walking.  Please advise your guests and contractors of gate closure.


Community Update - Entire Building Water Shut Off on 8/19/20

WATER SHUT OFF NOTICE

Dear Residents:

Due to an accumulated series of repairs, we have need to have a whole building water shut off.  These repairs include replacement of several emergency cut-off valves, replacement of several sections of cast iron drain pipe, camera examination of a sewer mainline, and replacement of some sections of copper supply line.  We will have multiple plumbers working simultaneously on this project to effect the repairs as quickly as possible.

HOT & COLD Water will be shut off

to the entire building on

Wednesday, August 19th

from 9:00a.m.- 4:00p.m.

We apologize for the inconvenience.  At this time, we ask that you do not schedule any plumbing repairs in your unit that require the water to be shut off. We will notify you via email if the repairs are completed and the water will be turned on sooner.

It is encouraged that all residents run all the water in their home for 3-5 minutes to allow for hot water to circulate throughout your unit after the water is turned back on. Running your water assists in the release of air pockets trapped inside the plumbing.

Thank you for your cooperation!

Audrey Madueño

General Manager


Community Update - 8/4/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Garage Gate Repairs– have been scheduled for Monday, August 10th from 9:30am to 2pm. These are necessary gate repairs.

We will have to interrupt traffic to close the garage gate between 9:00am – 11:30am for some repairs. We will do our best to work with any emergency situation. There will be times that the driveway can be blocked for intervals of 30 minutes until the work is completed.

GARAGE GATE CLOSURE

August 10th from 9:00am to 11:30am.

You will not be able to ENTER or EXIT the garage between the hours of 9:00am to 11:30am, you may experience a delay in entering and exiting the garage until 2pm.

We kindly request that you utilize an alternate entrance to the building if you are walking.  Please advise your guests and contractors of gate closure.


Community Update - Window Cleaning 7/20-7/24

NOTICE 07/14/20

Building Window Cleaning

Dear Residents:

Window cleaning will take place on July 20th – July 24th. The windows will be cleaned with a pole fed system that we will leave your windows wet and will need to air dry.

A&M Facility Services will begin cleaning perimeter windows on the 4th Floor on Monday, July 20th and Tuesday, July 21st.

Window cleaning of the perimeter of the building Floors 1- 3 will take place on Tuesday, July 21st and Wednesday, July 22nd.

Window cleaning of windows facing the courtyards (Floors 1-4) will take place on Thursday, July 23rd.

All homeowners will need to have their screens removed from their windows prior to the day of their window cleaning. 

If you need assistance removing your screens, A&M will provide that service for the fee set forth below.  Any windows with screens left on will not be cleaned.  Screens may be replaced after window cleaning is completed.

Monday, July 20th – Friday, July 24th  from 8:30 AM – 5:00 PM

You may contact Abraham @ A&M Facility Services to have extra services provided:

Screen Removal & Placement Only $25.00

Cleaning and Removal of Screens $55.00

Balcony Window Cleaning $35.00

Interior Window Cleaning $65.00

Package Deal $135.00 (all of the above)

Abraham 619-635-3475 or abraham@amfacilityservices.com


Community Update - 6/19/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Building Perimeter Sidewalk – some repairs to the sidewalk around the building perimeter have been scheduled for July 6th and July 7th. We ask that you exercise caution around the working area during this time.  Please note you may experience some loud noise and dust during the repairs.
  2. Marble Floor Polishing – scheduled for Tuesday, Wednesday, and Thursday, July 14th, July 15th, and July 16thduring the night. Please use caution during this time.
  3. 5th Floor Bathroom Tile – will be cleaned on Wednesday, July 15th during the night. The bathrooms will be closed during this time.
  4. Community Room – the stone tables will be cleaned on Thursday, July 16th during the night. The tables will need to dry, please do not use the tables for 24 hours.
  5. Window Cleaning – will be scheduled for mid to late July. More detailed information to follow soon.

Community Update - 5/14/20

Annual Meeting 2020 – Thank you to those who participated via Zoom and those who mailed in their ballots, we established quorum.

We would like to thank the homeowner who volunteered as Inspector of Election: Mark Cujak.

We would also like to thank the Candidates who submitted statements to run for the Board and congratulate them as they were elected to the board: John Gowan, Laserik Saunders, and Joan Wojcik.

Official Results have been posted.


Community Update - 3/13/20

Dear Residents,

Just a brief update on things happening here at Watermark

  1. Social Event – the Season’s 52 event has been postponed. We will provide a new date soon.
  2. Elevators – please use caution when carrying items or using a cart in the elevator as to not scratch the brass. Additionally, please do not use sharp objects to press the call buttons for the elevator.
  3. Inclement Weather – just as a reminder during the rainy season, you may want to check your patio drains to ensure they are clear from debris and that they are not covered by a piece of furniture or rug in order to allow for proper drainage.

Older Entries »

Location

650 Columbia Street
San Diego, CA 92101
phone | (619) 795-1727

Management Team

General Manager
Audrey Madueño | amadueno@actionlife.com

office phone | (619) 795-1727

Security Officer
desk phone | (619) 236-0152
cell phone | (619) 840-9367

Management Company

Action Property Management
www.actionlife.com
Regional Office
1133 Columbia Street, Suite 106
San Diego, CA 92101
phone | (949) 450-0202